Stone arch between the wet bar and the theatre in a finished Parker walk-out basement
Parker, Colorado · Basement Finishing

Four thousand two hundred square feet. One of the bookshelves is a door.

A whole lower level finished under one contract — two bedrooms with en-suites, a theatre behind barn doors, a wet bar under stone arches, a gym, and a hidden storage room you cannot find from the room it opens off.

Scope4,200 sq ft of unfinished basement, finished under one contract
What is down thereTwo bedrooms with en-suites, theatre, wet bar, gym, hidden storage room
JurisdictionDouglas County, Colorado
TimelineContracted September 2021 · final building inspection June 2022
The project

Finishing 4,200 square feet is not a bigger version of finishing one thousand.

A walk-out lower level, framed and empty, under an occupied house. The contract finished all of it at once — eight rooms plus a thirty-four foot hallway — rather than in the phases most basements of this size get broken into.

Scale changes the problem. At this size the mechanical load stops being an afterthought: the basement needed its own thermostats, its own water heating, and drains that were not where the new rooms wanted them. Three of those answers are underneath the finished floor, and one of them meant breaking the slab. The visible work — stone, reclaimed timber, knotty alder — sits on top of decisions that were made before any of it was ordered.

  • 1,200 sq ft family room with a work-out area, under false beams and on stone-clad posts
  • 450 sq ft media room with its own storage closet
  • 150 sq ft wet bar with pantry, under stone arches opening to the theatre
  • 230 sq ft bedroom with attached three-quarter bath and walk-in closet
  • 275 sq ft bedroom with attached full bath and walk-in closet
  • 100 sq ft hidden storage room, entered through a bookshelf
  • 500 sq ft finished storage room, powder room, and a 34 ft hallway of built-in stain-grade shelving
Timeline

Eight and a half months, contract to final inspection.

258 days from the executed contract to the final building inspection. Every marker sits at its true position on that span.

Framing to millwork3.4 monthsStone, reclaimed finish, change order5.0 months09.2021Contract executed12.2021Cabinets, tile, doors06.2022Final building inspection

The stage payments cluster in the first four months — framing, rough electrical, rough plumbing, rough HVAC, windows, insulation and drywall all cleared by January. The remaining five months are stone and reclaimed millwork — including the additional stone agreed by change order in May 2022 — which is the part that cannot be rushed and the part a homeowner actually sees. The finish took longer than the build.

The bar & the arch

Reclaimed boxcar countertops, knotty alder, and stone that carries itself.

150 square feet of wet bar with a pantry behind it. The countertops were fabricated from reclaimed boxcar decking — 108 square feet of it — and the wall behind the bar is 300 square feet of barn wood on plywood backing.

01Wet bar with reclaimed barn wood wall, boxcar countertops and glass pendants, Parker Colorado basement
02Stone arch between the wet bar and the theatre, Parker Colorado basement
03Boxcar countertops and knotty alder bar cabinetry, Parker Colorado basement
04Hammered copper bar sink set in reclaimed boxcar countertop, Parker Colorado basement
05The wet bar seen from inside the theatre through the stone arch, Parker Colorado basement
06Bar elevation with built-in shelving and reclaimed timber, Parker Colorado basement
The theatre

450 square feet of media room, on a riser that moved.

Tiered seating on a framed riser, walls in stone and reclaimed timber, entered through a pair of reclaimed barn doors. The riser was relocated under Change Order 1 once the sightlines were checked against the finished screen position.

01Home theatre with projection screen and wall sconces, Parker Colorado basement
02Theatre seating and screen from the rear, Parker Colorado basement
03Stone veneer wall in the theatre, Parker Colorado basement
04Tiered recliner seating on the theatre riser, Parker Colorado basement
05Pair of reclaimed barn doors at the theatre entrance, Parker Colorado basement
06Reclaimed timber panelling and stone in the theatre, Parker Colorado basement
Family room & gym

1,200 square feet under false beams, with the gym at one end of it.

The largest room in the contract, opening to grade through the walk-out. 98 lineal feet of false beam across the ceiling, stone-clad posts, and 243 square feet of rubber tile where the work-out area sits.

01Family room with stone-clad posts and false beams, walk-out basement in Parker Colorado
02Walk-out window wall along the family room, Parker Colorado basement
03Stone veneer posts dividing the family room, Parker Colorado basement
04Family room seen from the bar end of the basement, Parker Colorado
05Built-in stain-grade shelving on stone wainscot, Parker Colorado basement
06Work-out area on rubber tile flooring with walk-out windows, Parker Colorado basement
Bedrooms & baths

Two bedrooms, two en-suites, and a powder room built around a barrel.

Both bedrooms have an attached bath and a walk-in closet. Both needed a new window cut into the existing exterior wall before either could legally be called a bedroom.

01Basement bedroom with attached en-suite and walk-in closet, Parker Colorado
02Basement bedroom with new egress windows at grade, Parker Colorado
03Second basement bedroom with knotty alder doors and walk-in closet, Parker Colorado
04En-suite vanity with reclaimed timber mirrors and sconce bar, Parker Colorado basement
05Tiled tub and shower with glass enclosure and mosaic band, Parker Colorado basement
06Powder room with barrel vanity and glass pendant cluster, Parker Colorado basement
The materials

Reclaimed boxcar, stone arches and knotty alder throughout.

Stone553 sq ft of Blue Spruce cobble veneer, plus 276 sq ft added by change order — arches, posts and wainscot
Reclaimed108 sq ft of fabricated boxcar countertop, 300 sq ft of barn wood wall, 6 interior barn doors
MillworkKnotty alder — 670 lineal ft of base, 10 solid-core doors, 200 sq ft of built-in cabinetry, 98 lineal ft of false beam
Metal45 lineal ft of steel and reclaimed wood wainscot, under the bar and on the storage room and powder room walls
Floors346 sq yd of carpet, 492 sq ft of ceramic tile, 243 sq ft of rubber gym tile
Electrical93 recessed cans plus 16 on adjustable trim, 70 outlets, 24 dedicated circuits, 32 dimmers
WaterTwo 75-gallon power-vent gas water heaters and an automatic shut-off system with two remote leak detectors
AirBaffle system on the existing furnaces so the lower level runs on its own thermostats

Every quantity above is taken from the executed contract and its unit-price estimate for this project.

The part you cannot see

Two bookshelves on that wall. One of them opens.

The contract calls for two bookshelves on that wall, one to be built with hidden door hardware. Behind it is a 100 square foot room with a steel flush door, roughed for waste and supply so it can be used for longer than an afternoon.

The harder hidden work is structural, and it is the reason a Front Range basement is not a Midwest basement. 5,200 square feet of non-bearing wall in this job is floating — pressure-treated sole plate glued to the slab, a cap plate and a bottom plate, and a 60d spike every four feet. The walls are deliberately not fixed to the floor, because the soil under the slab moves and a wall that is fixed to a moving slab will telegraph that movement straight into the drywall above it.

Underneath the finish there is also 25 lineal feet of new below-ground waste line, which meant breaking the concrete floor, running the drain, and replacing the slab before a single wall went up. Two new 5‑0 x 5‑0 casement windows were framed into the existing exterior wall and the stucco patched around them — without those two openings, neither of the two rooms downstairs could be permitted or sold as a bedroom.

01Two built-in bookshelves, one of which is a concealed door to a hidden storage room, Parker Colorado basement
02Ductwork, wiring and plumbing run through the ceiling before drywall, Parker Colorado basement
03Floor joist repair carried out before insulation and drywall, Parker Colorado basement
04Steel door to the hidden storage room standing open behind the concealed bookshelf, Parker Colorado basement
05Locking bolt work down the edge of the steel storage room door, Parker Colorado basement
06Foundation wall sealed and tested for water before the basement was finished, Parker Colorado
Building in Douglas County

The soil decides more of this than the drawings do.

Douglas County sits on some of the most expansive soil on the Front Range. That single fact drives the two requirements that catch out-of-state contractors and unpermitted basement finishes here.

Basement walls float. Interior non-bearing walls in a Front Range basement are built with a gap at the top and fastened so the slab can rise and fall underneath them without loading the framing. This is not a detail you add later — it changes how every wall in the basement is framed, and an inspector will look for it.

Below-grade bedrooms need their own way out. A finished basement room only counts as a bedroom if it has an emergency escape and rescue opening. On this project that meant cutting two new openings in an existing stucco exterior wall and framing 5‑0 x 5‑0 casement windows into them. A basement finish that quietly calls a windowless room a bedroom is a problem at resale, at appraisal, and in an emergency.

This project was permitted and closed out on a final building inspection, which was the last contractual milestone before the balance was invoiced in June 2022.

Straight answers

Basement finishing questions we get asked.

Can a basement this size be finished under one contract?

Yes. This one was 4,200 square feet — eight rooms plus a thirty-four foot hallway — finished under a single executed contract with one crew and a stage payment schedule rather than in separate phases. Phasing a basement usually costs more, because trades come back to the same room twice.

Does a basement bedroom need its own window?

Yes. A below-grade room cannot be permitted as a bedroom without an emergency escape and rescue opening. On this project two new casement windows were framed into the existing exterior wall and the stucco patched around them. If your basement plan includes bedrooms, budget for the openings before you budget for the finishes.

Why do basement walls in Colorado have to float?

Because the soil under the slab expands and contracts with moisture. A non-bearing wall is built so the slab can move underneath it without pushing up into the framing — pressure-treated sole plate glued down, and spiked at intervals rather than fixed hard. 5,200 square feet of wall on this job was framed that way. A wall that is fixed rigidly to a moving slab cracks the drywall above it.

Can you move a drain that is already in the slab?

Yes, and on this project we did — 25 lineal feet of new below-ground waste line, which meant breaking the concrete floor, running the drain and replacing the slab. It is done first, before framing. If a bathroom or wet bar is not where the existing plumbing is, this is the work that makes it possible.

Can the basement be heated and cooled separately from the rest of the house?

Often, without new equipment. Here a baffle system was installed on the existing furnaces and new ducting run, so the finished lower level runs on its own thermostats. Whether that works depends on the capacity you already have — it is checked before it is promised.

Can you build a hidden storage room into a basement finish?

Yes. This one is 100 square feet with a steel flush door, roughed for waste and supply, and entered through a built-in bookshelf fitted with hidden door hardware. It has to be designed in at framing — the wall, the door frame and the concealed hardware are all decided before drywall.

How long does a basement of this size take?

This one ran 258 days — about eight and a half months — from executed contract to final building inspection. The rough trades and drywall cleared inside the first four months. The remaining five were stone and reclaimed millwork, which is the slow part on any job with this much custom finish in it.

Start yours

Tell us what is down there now. We will tell you what it can be.

Ceiling height, where the existing drains run, what your furnace has left in it, and whether the rooms you want can have windows — those four answers decide what a basement can become, and they are worth knowing before anyone draws anything.

Prefer to talk now? Call (720) 637-2060

Book a consultation

Tell us the size of the space and what you are picturing down there. We come back with what it will actually take.

Get a free estimate →

Requests are finished on our secure form.