Completed home addition and whole-home remodel with stacked stone and a timber entry on the Front Range
Cherry Hills Village, Colorado · Design-Build

Cherry Hills Village additions, remodels and custom builds.

Design-build in Cherry Hills Village — additions, whole-home remodels, accessory buildings and custom work, designed to an envelope that is stricter than anywhere else in the metro.

Cherry Hills Village, Colorado

In Cherry Hills Village the envelope is the project. Everything else follows it.

Cherry Hills Village runs on two-and-a-half-acre minimum lots in R-1, a 75-foot front setback for accessory structures, and a floor area ratio capped at 23 per cent. Large lots do not mean loose rules here — they mean the opposite. The constraint is not how much land you have, it is how much building the code will let you put on it.

Lot minimums and setbacks2½ acres in R-1, 75-foot front setbackMinimum lot sizes run R-1 2½ acres, R-2 1¼ acres, R-3 1 acre, R-4 ½ acre and R-5 16,000 sq ft. Accessory-structure setbacks in R-1 and R-2 are 75 feet at the front with 25 feet at the sides and rear; R-3 is 50 feet front; R-4 and R-5 are 25 feet front. These numbers, not the height cap, usually decide where a building can go.
Floor area and bulk plane23% FAR — and a 12′6″ bulk planeR-1 and R-2 cap both lot coverage and floor area ratio at 23 per cent; coverage runs 23 to 30 per cent citywide by zone. On top of that, an accessory-building bulk plane begins at a starting height of 12 feet 6 inches and rises at 40-degree angles toward the centre of the lot. That bulk plane, not the nominal 35-foot height limit, is what actually constrains a tall accessory building.
Accessory structuresRationed by count and by footprintThe city rations accessory buildings: R-1 three structures totalling 1,100 sq ft; R-2 three at 750; R-3 three at 650; R-4 and R-5 two at 500. Parcels of 20 acres or more scale up to seven structures and 3,150 sq ft. If you already have outbuildings, they come out of the same allowance.
Review sequenceTen business days per cycle — and it is sequentialEach review cycle is 10 business days per division, and reviews run in sequence: Planning must approve before any Building or Civil Engineering review occurs. So a rejected planning review does not run in parallel with anything — it restarts the clock. Permits also expire if work does not commence within 90 days of issuance.

Verified against official City of Cherry Hills Village and Colorado Department of Local Affairs sources as of August 2026. Code editions and ADU rules change, and several Front Range jurisdictions are mid-revision right now. Treat this as the starting point for your project, not as legal advice, and confirm the current standard with Cherry Hills Village Community Development before you commit to a design. We do that on every job as a matter of course.

Straight Answers

Cherry Hills Village questions we get asked.

I have acres of land. Why is my addition constrained?

Because Cherry Hills Village caps floor area, not just footprint. R-1 and R-2 limit both lot coverage and floor area ratio to 23 per cent, and coverage runs 23 to 30 per cent citywide by zone. On top of that, accessory-structure setbacks in R-1 and R-2 are 75 feet at the front and 25 feet at the sides and rear. Large lots here come with proportionally strict rules – the land is rarely the binding constraint, the envelope is.

What limits the height of a detached studio or garage?

The bulk plane, not the height cap. An accessory-building bulk plane begins at a starting height of 12 feet 6 inches and rises at 40-degree angles toward the centre of the lot. That is what actually decides how tall a detached building can be near a property line, well before the nominal 35-foot maximum comes into play. There is also a hard ration on accessory buildings – R-1 allows three totalling 1,100 sq ft, R-2 three at 750, R-3 three at 650, and R-4 and R-5 two at 500.

How long does Cherry Hills Village review take?

Ten business days per review cycle, per division – but the cycles are sequential, not parallel. Planning must approve before Building or Civil Engineering opens the file at all. That means a rejected planning review restarts the clock rather than running alongside another review, so the realistic worst case is additive ten-day cycles. Permits also expire if work does not commence within 90 days of issuance. Submitting complete the first time is worth more here than anywhere else we work.

Completed home addition with stacked stone and a timber entry on the Front Range
Start Yours

Bring us the house you already love.

We will look at what is standing, what your envelope actually allows and what Cherry Hills Village requires — then tell you honestly what it takes. It starts with a short phone consult, not a sales visit.