Parker additions, ADUs and whole-home remodels.
Design-build across Parker — additions, accessory dwelling units, whole-home remodels and structural work, with Parker’s two review clocks planned for rather than discovered.
Parker runs two clocks. Almost nobody tells homeowners about the first one.
Every Parker application goes through a five-day completeness assessment before the review clock starts. Submit an incomplete set and you have quietly added a week before anyone has looked at your drawings. Parker also requires town contractor licensing, so an out-of-town builder cannot simply pull a permit here.
Verified against official Town of Parker and Colorado Department of Local Affairs sources as of August 2026. Code editions and ADU rules change, and several Front Range jurisdictions are mid-revision right now. Treat this as the starting point for your project, not as legal advice, and confirm the current standard with the Parker Building Division on 303.841.1970 before you commit to a design. We do that on every job as a matter of course.
We have finished a 4,200 square foot walk-out basement in Parker — two bedrooms with en-suites, a theatre, a wet bar under stone arches and a hidden safe room. See the project.
Straight Answers
Parker questions we get asked.
How long does a Parker permit take?
Longer than the published number if your set is incomplete, because Parker runs two clocks. Every new application first goes through a five-day completeness assessment before the review clock starts. After that: existing residential additions and interior remodels at one to two weeks; new construction at two to four weeks, with re-review generally two to three weeks and up to four; minor work such as decks, patios and basement finishes at one to five working days. Submitting a complete set is worth about a week.
Can any contractor pull a permit in Parker?
No. Parker requires contractor licensing with the Town before a permit can be issued, and all permits go through the eTRAKiT online portal rather than a counter. An out-of-town general contractor cannot pull a Parker permit cold. It is worth confirming your builder is licensed with the Town before you sign anything.
Can I build an ADU in Parker?
The state floor applies and it is strong. We found no published Parker ADU regulations – the Planning Division page does not mention them. But Parker is a subject jurisdiction under Colorado HB24-1152, which requires one ADU to be allowed wherever single-unit detached homes are allowed, decided by administrative approval with no public hearing, on objective standards only, with no permanent owner-occupancy requirement, generally no new parking space, and 500 to 750 square feet permitted. If anyone tells you an ADU in Parker requires a public hearing, that is worth questioning. We confirm the current local process with the Town before designing one.

Bring us the house you already love.
We will look at what is standing, what it can carry and what Parker requires before the clock even starts — then tell you honestly what it takes. It starts with a short phone consult, not a sales visit.
Prefer to talk now? Call (720) 637-2060
Get your free project estimate
A few quick questions on our secure estimate page — about 2 minutes. We call you back the same business day to talk it through.
Whole-Home Remodels
Down to the studs where it needs to be, staged so you can live through it where it does not.
Home Additions
Rear, side and bump-out additions engineered to what the existing structure can actually carry.
ADUs
Detached, attached and basement accessory dwelling units, designed to the standard that applies on your lot.
Second Storeys & Pop-Tops
Adding a floor without moving. The structural question gets answered before the design does.
Kitchen Remodels
Layout, structure and services together — most kitchens that disappoint were solved on paper only.
Basement Finishes
Egress, ceiling height, moisture and mechanicals settled before a single wall goes up.
Structural Remodeling
Load-bearing walls, beams and foundations — the work that makes open plans possible.
Custom Homes
Ground-up design-build on your lot, with the same documentation discipline as our remodels.
Nearby
Lone Tree
Planned Development zoning — your setbacks live in your PD plan, not the municipal code.
Castle Rock
2024 code, a wildfire code that reaches remodels, and the metro’s highest tap fees.
Centennial
Full published permit turnaround times — and an unusual ADU design-match rule.