Greenwood Village additions and whole-home remodels.
Design-build across Greenwood Village — additions, whole-home remodels, kitchens and structural work, with the outside-agency approvals scheduled rather than discovered.
Greenwood Village is still on the 2018 code. That is a seven-year spread inside one metro.
Greenwood Village adopted the 2018 International Residential Code and the 2017 National Electrical Code. Castle Rock, Denver, Arvada, Wheat Ridge, Englewood and Littleton are all on the 2024 cycle. That is a genuine seven-year spread across a forty-minute drive, and it means a set of plans drawn for a neighbouring city is not a set of plans for here.
Verified against official City of Greenwood Village and Colorado Department of Local Affairs sources as of August 2026. Code editions and ADU rules change, and several Front Range jurisdictions are mid-revision right now. Treat this as the starting point for your project, not as legal advice, and confirm the current standard with the Greenwood Village Building and Planning Divisions before you commit to a design. We do that on every job as a matter of course.
Greenwood Village questions we get asked.
Which building code will my Greenwood Village plans be drawn to?
The 2018 International Residential Code, with the 2017 National Electrical Code – the oldest cycle of any jurisdiction we work in. Englewood, Littleton, Denver, Arvada, Wheat Ridge and Castle Rock are all on the 2024 cycle and Centennial is on 2021, so that is a seven-year spread across a short drive. Plans drawn for a neighbouring city are not automatically valid here. A separate city ordinance and code section exist that we could not read directly, so we confirm the current edition with the Building Division before drawing.
What actually delays a Greenwood Village project?
The outside agencies, not usually the city. Residential submittals require South Metro Fire and Rescue approval as a named layer, plus separate stormwater, sewer and water connection permits, and a conditional landscape and irrigation plan. Greenwood Village’s own checklist also instructs applicants to obtain HOA approval where the property is in an HOA-governed area. We schedule those at the front of the programme rather than chasing them at the end.
How long is plan review in Greenwood Village?
The city publishes 15 business days for residential single-family and additions, 10 business days for standard plan review, and 3 business days where no plan review is required. It also publishes its own disclaimer advising applicants to verify with the Building and Planning Divisions, so we plan to those numbers but do not promise them.

Bring us the house you already love.
We will look at what is standing, what it can carry and which approvals sit on your critical path — then tell you honestly what it takes. It starts with a short phone consult, not a sales visit.
Prefer to talk now? Call (720) 637-2060
Get your free project estimate
A few quick questions on our secure estimate page — about 2 minutes. We call you back the same business day to talk it through.
Whole-Home Remodels
Down to the studs where it needs to be, staged so you can live through it where it does not.
Home Additions
Rear, side and bump-out additions engineered to what the existing structure can actually carry.
ADUs
Detached, attached and basement accessory dwelling units, designed to the standard that applies on your lot.
Second Storeys & Pop-Tops
Adding a floor without moving. The structural question gets answered before the design does.
Kitchen Remodels
Layout, structure and services together — most kitchens that disappoint were solved on paper only.
Basement Finishes
Egress, ceiling height, moisture and mechanicals settled before a single wall goes up.
Structural Remodeling
Load-bearing walls, beams and foundations — the work that makes open plans possible.
Custom Homes
Ground-up design-build on your lot, with the same documentation discipline as our remodels.
Nearby
Cherry Hills Village
Two-and-a-half-acre minimums, 75-foot setbacks and a 23% floor area cap.
Centennial
Full published permit turnaround times — and an unusual ADU design-match rule.
Englewood
Bulk plane, the 2024 code, and an ADU allowance with no owner-occupancy and no parking requirement.