Completed rear elevation of a Denver home addition with new lap siding, a bank of double-hung windows and a French door
Denver, Colorado · Design-Build

A Denver home addition,photographed from frozen groundto finished kitchen.

Most contractors show you the after. This one is the whole build — the dig, the rebar, the pour, the framing, the pipe in the wall, and then the kitchen.

The Project

An addition is a foundation project that ends in a kitchen.

This Denver home addition extended a single-storey ranch at the rear: new excavation, a new poured foundation tied into the original house, new framing under a roof that had to meet the existing one, and inside it a new kitchen and a new bathroom.

Homeowners tend to shop additions by looking at finished rooms. That is the last ten per cent. Everything that decides whether an addition is worth what you paid for it happens in the first ninety — how deep the footings went, how the new foundation was tied to the old one, whether the roofline meets cleanly, and whether the mechanicals were planned before the walls closed.

So this page is built the other way round. It starts in the dirt in February and ends at a finished range wall, because that is the order the money is actually spent in.

Finished interior of a Denver home addition with recessed lighting, wood-trimmed windows and a vaulted ceiling

Inside the finished addition · Denver

6
Stages photographed, dig to finish
100+
Job photographs from this one build
1
Design-build contract, one accountable team
0
Handoffs between designer, engineer and builder
01 · Excavation & Foundation

It started in February, in frozen ground.

Denver additions get dug in winter because winter is when the permit clears. Snow on the spoil pile is not a problem — frost depth is. Footings on the Front Range go below the frost line, forms get stripped only when the concrete has the strength to take backfill, and the under-slab plumbing goes in before anyone pours anything.

01Excavation with batter boards and string lines for a Denver home addition, dug in winter snow
The dig
02Foundation wall forms and rebar set on a Denver home addition
Forms and steel
03Rebar cage set inside the foundation forms of a Denver home addition
Rebar before the pour
04Under-slab drain and vent plumbing roughed in before the pour on a Denver home addition
Plumbing under the slab
05Poured concrete foundation wall on a Denver home addition after the forms were stripped
Stripped and cured
06New foundation tying into the existing house foundation on a Denver home addition
Where new meets old

The last frame is the one that matters and the one nobody photographs: the joint where a new foundation meets a foundation poured decades earlier. Get that wrong and you find out about it in a drywall crack two winters later.

02 · Framing & Envelope

The roof had to meet a house that was already there.

Framing an addition is not framing a house. Floor level, plate height, roof pitch and window proportion all have to carry across from the existing structure, and the tie-in has to shed water for the next thirty years. Once the shell was up it was wrapped, flashed and glazed before a single interior trade came near it.

01Sheathed shell of a new Denver home addition with the wall to the existing house still open
Shell up, wall open
02Engineered roof framing tying a new Denver home addition into the existing roofline
Roof tie-in
03New French doors and windows set into the house-wrapped wall of a Denver home addition
Doors set and flashed
04House wrap and roof framing over a new window opening on a Denver home addition
Wrapped and dried in
05New windows installed in the house-wrapped wall of a Denver home addition
Glazing in
06Bank of new windows installed and house-wrapped on a Denver home addition
Window bank wrapped
03 · Rough-In

Everything you will never see again, photographed once.

Duct, drain, vent, water, wire and insulation all have to occupy the same joist bays and the same stud cavities without fighting each other. On a design-build job that coordination happens on paper first, which is why the rough-in looks tidy rather than negotiated.

01Drain and vent plumbing run through the floor framing of a Denver home addition
Drain and vent
02Flexible HVAC ductwork routed through the framing of a Denver home addition
Ductwork
03PEX water distribution manifold with red and blue supply lines in a Denver home addition
PEX manifold
04Framed interior openings and ceiling joists in a Denver home addition before drywall
Interior framing
05Engineered beam and post carrying the load over an open span in a Denver home addition
Beam and post
06Insulated floor framing and can light housings in a Denver home addition
Insulation and cans
04 · Siding & Water Management

Matched to the house, then drained properly.

Lap siding to match the original walls, board-and-batten in the new gable, and — the part that decides whether the foundation you just paid for stays dry — gutters, downspouts and drain lines taken away from the wall rather than dumped at it.

01House wrap and the first courses of lap siding on a Denver home addition
First courses
02House-wrapped gable end of a Denver home addition before siding
The new gable
03New window trimmed into the siding of a Denver home addition
Window trimmed in
04Siding running up to the existing wall of the original house on a Denver home addition
Meeting the old wall
05Downspout and buried drain line taking roof water away from the new foundation of a Denver home addition
Water taken away
06Soffit, fascia and gutter edge where new siding meets the eave on a Denver home addition
Under the eave
05 · The Kitchen

Shaker cabinetry, stone mosaic and a pro range.

White shaker cabinetry with glass-front uppers, dark solid-surface counters, a stone mosaic backsplash carried to the hood, an undermount stainless sink under the window, and recessed lighting laid out before the ceiling closed rather than after.

01Base cabinets set and levelled in a new Denver home addition kitchen before countertops
Cabinets set
02Kitchen island framed and sheathed before cabinetry and stone in a Denver home addition
Island framed
03Stone mosaic backsplash tile being installed between glass-front upper cabinets in a Denver home addition kitchen
Backsplash going in
04Finished range wall with stainless pro-style range, wall hood and stone mosaic backsplash in a Denver home addition kitchen
The range wall
05Undermount stainless sink and gooseneck faucet under a window in a Denver home addition kitchen
Sink and window
06Bank of new double-hung windows with wood trim above the cabinet run in a Denver home addition kitchen
The window wall
06 · The Bathroom

A double vanity, and tile set on a flat floor.

Two sinks in marble-look quartz over dark shaker cabinetry, a tiled tub and shower surround, and a tiled floor laid on a substrate that was made flat first — which is the difference between tile that lasts and tile that telegraphs every joint.

01New bathtub set and boxed in protective foam and plastic during construction of a Denver home addition
Tub set and protected
02Subway tile running up the tub surround wall in a Denver home addition bathroom
Tile going up
03Tiled shower surround with a recessed niche and valve rough-in in a Denver home addition bathroom
Niche and valve
04Finished tile floor laid on a flat substrate in a Denver home addition bathroom
Floor tile
05Double vanity with marble-look quartz countertop and brushed nickel faucets in a Denver home addition bathroom
The double vanity
06Finished bathroom with tub, toilet, tile floor and dark vanity cabinetry in a Denver home addition
Finished bath
The Result

From the yard, it reads as part of the house.

Same siding profile, same trim proportion, same roof pitch, one continuous run of gutter. A covered patio under the new roof turned the back of the house into somewhere the family actually sits. The dig was in snow. This is the same wall in summer.

01Finished rear exterior of a Denver home addition with covered patio, new siding and a restored lawn
Summer, same wall
02Covered patio with ceiling fan on a completed Denver home addition
Covered patio
03Finished rear elevation of a Denver home addition with a bank of new windows and a covered walk
Rear elevation

We’ve worked with AAA Home Improvements for several projects since moving into our home and I can say without exaggeration that our experience working with them has been nothing short of phenomenal. Toby Hertel and his team are first-class professionals with a wealth of knowledge and expertise.

Kevin C.
Google review · January 2024
Why It Worked

On a Denver home addition, the risk is underground and in the roofline.

Additions are the one project type where the finished photographs tell you almost nothing about the quality of the work. Two additions can look identical from the lawn and be twenty years apart in service life, because everything that decides that is buried, flashed or framed behind drywall.

The foundation tie-in is the whole job

A new footing and a fifty-year-old footing settle at different rates. The connection between them has to be designed, not improvised on the morning of the pour. On a design-build contract the person who engineered that joint and the person who formed it work for the same company, so there is no three-way conversation about whose drawing was wrong.

Winter work is normal here, if it is planned

Front Range permits do not wait for spring. Footings below frost depth, protected concrete and a sequence that gets the shell dried in before the wet months is ordinary practice — but it has to be scheduled that way from the start, not discovered in February.

Matching the existing house is a design decision, not a siding order

Roof pitch, plate height, window proportion, trim width and siding exposure all carry across from the original structure. Getting those five things right is what makes an addition read as original. Getting them wrong is what makes a house look like it grew an extra building, and no amount of finish budget fixes it afterwards.

Coordinate the mechanicals before the walls close

Duct, drain, water, wire and structure all compete for the same cavities. When they are coordinated on paper, the rough-in goes in once. When they are not, something gets cut, boxed out or dropped — and the ceiling in your new kitchen ends up four inches lower than the one you were shown.

If you are weighing a home addition in the Denver Front Range, ask whoever quotes it to show you their foundation and framing photographs before you look at anyone’s finished kitchen. You can also see how the same team handled a two-phase remodel and addition in Littleton.

Poured foundationRoof tie-inPEX manifoldShaker cabinetryStone mosaicCovered patio
Covered patio and French door on a finished Denver home addition
Start Yours

Show us the wall you want to build through.

We will look at what is standing, what your foundation and lot can carry, and what the roofline will allow — then tell you honestly what it takes. It starts with a short phone consult, not a sales visit — and if it looks like a fit, we come out and look properly.

Prefer to talk now? Call (720) 637-2060

Get your free project estimate

A few quick questions on our secure estimate page — about 2 minutes. We call you back the same business day to talk it through.

Start My Free Estimate