A Highlands Ranch primary bathroom, rebuilt around the shower.
A full primary bathroom remodel in Highlands Ranch — a frameless glass walk-in shower, a double vanity in dark shaker cabinetry, and a layout that gave the shower the space it needed.
The shower drove every other decision in the room.
Most bathroom remodels start with finishes. This one started with the shower footprint. Once the walk-in enclosure was sized properly — wide enough for a bench, a handheld and a full-height glass panel — the vanity, the mirror and the water closet all had to be arranged around what was left. That order matters, and it is the difference between a shower that feels generous and one that technically fits.
The finish palette is deliberately quiet so the room reads larger than it is: marble-look large-format tile on the walls, a dark mosaic underfoot to ground the shower, and dark shaker cabinetry against a light quartz-look countertop. The teak stool is the only warm note in the room, and it is doing a lot of work.
A note on scope. Bathrooms like this one are usually the strongest part of a bigger job for us — paired with a kitchen, folded into an addition, or built inside a whole-home remodel. That is where our crews, our permitting and our pricing work best. If a bathroom on its own is all you need, say so on the call and we will tell you straight whether we are the right fit.
Nine frames, no styling tricks.









What the job actually involved.
- Frameless glass walk-in shower enclosure with a full-height fixed panel and a swing door.
- Marble-look large-format wall tile throughout the shower, with a recessed tiled niche set at usable height rather than wherever the studs allowed.
- Dark mosaic tile shower floor — small format for slip resistance and to take the fall to the drain without lipping.
- Wall-mounted shower controls with a separate handheld on a slide rail.
- Double vanity in dark shaker cabinetry with a light quartz-look top and undermount basins.
- Full-width mirror above the vanity with wall sconces rather than a single overhead fitting.
- Separate water closet retained beyond the shower.
- Tile flooring carried through the room, with the existing window and cellular shade kept.
Questions this project raises.
How long does a primary bathroom remodel like this take?
It depends far more on the shower than on the room. A tiled walk-in enclosure with a mosaic floor and a niche involves waterproofing, a mortar bed, tile setting and a cure before glass can even be measured — and frameless glass is made to measure after the tile is in, not before. We will give you a schedule on your specific room rather than a number off a page, because the honest answer changes with what is behind the walls.
Do I need a permit for a bathroom remodel in Highlands Ranch?
Almost certainly, and the approvals are the part people underestimate. Highlands Ranch is unincorporated Douglas County: the county issues the permit, but the Highlands Ranch Metro District has to approve first because the county will not issue a permit or a certificate of occupancy without it. Most exterior work also goes to the HRCA Architecture Committee, and some sub-associations add a fourth layer. Interior bathroom work is simpler than exterior work, but the sequence still needs mapping before design. More on our Highlands Ranch page.
Can you move the shower or the vanity, or am I stuck with the existing layout?
Usually you can move them, and this project is an example — the room was arranged around the shower rather than the other way round. What decides it is drainage, joist direction and whether the wall you want to move is carrying load. Those three get answered before we draw anything, because they set the cost band. Moving a drain across joists is a different job from moving it along them.

Bring us the room you use every day.
We will look at what is behind the walls, what your layout can actually carry and what Highlands Ranch requires — then tell you honestly what it takes. It starts with a short phone consult, not a sales visit.